GB grid map
The map places 2,161 operating solar, wind, battery and gas sites of 1 MW and over, 77.0 GW in all, with NESO's boundary flows and interconnectors; sites from DESNZ's Renewable Energy Planning Database (Q2 2026) and the Balancing Mechanism register.
Loading
Sites by technology and status (count, MW)
| Technology | Operating | Under construction | Consented |
|---|---|---|---|
| Solar | 1,239 · 10,876 MW | 142 · 3,185 MW | 956 · 25,737 MW |
| Battery | 137 · 4,942 MW | 95 · 9,707 MW | 714 · 70,819 MW |
| Onshore wind | 701 · 14,293 MW | 35 · 2,011 MW | 173 · 6,736 MW |
| Offshore wind | 49 · 16,011 MW | 7 · 10,445 MW | 21 · 18,487 MW |
| Gas (transmission) | 35 · 30,857 MW | 0 · 0 MW | 0 · 0 MW |